Everything the job needs, in one record.
Site Metric Pro covers the work before the job, during it, and after it. Start with the part you need — every module reads and writes the same project, so nothing has to be entered twice.
Measure the plans, then price the work from your own numbers.
Takeoff quantities and estimate pricing live on the same record. A measured slab becomes a priced concrete line without a spreadsheet in between.
- Measure on the sheet: areas, runs, counts and volumes, with a scale you set for the page or override for a single detail.
- Volumes keep the numbers that made them — 1,000 SF at 6 in reads as 18.52 CY, with the thickness and depth you entered still visible.
- Saved takeoff tools carry the unit, colour, waste factor and cost link, so the next measurement of that kind is one click.
- AI-assisted takeoff proposes detected items and quantities in a run you review; nothing reaches an estimate until you approve it.
- Approved quantities import as CY, LF, SF or EA and price from your material, labor, crew, equipment and subcontractor rates.
Manual takeoff runs on every estimating plan. AI-assisted plan takeoff is on Advanced.
Estimate line items
Draft- Ready-mix concrete, 6" slab$3,425.93
Material · 18.52 CY × $185.00
- Concrete crew — place & finish$1,296.00
Labor · 18.0 HR × $72.00
- Skid steer + screed$168.00
Equipment · 3.5 HR × $48.00
Demo data. A measured 1,000 SF slab arrives in the estimate as 18.52 CY, priced from the company cost library.
Bid the work with a number you can defend.
Track every opportunity until it is awarded, then send a proposal that shows the customer the scope and the price — and only that.
- The pipeline keeps each opportunity's due date, value, stage and outcome, so you can see what is due this month and what it is worth.
- Build the proposal from the estimate: standard, detailed, unit-price or fully custom section templates.
- Choose how price is presented — one total, section subtotals, or itemized by section — and add an acceptance block when the customer signs.
- Internal cost, margin and production rates stay internal: the customer copy carries scope, terms and price.
- Award it and the estimate becomes an active project with its schedule of values, billing items, cost codes and contract quantities.
Bid pipeline
Open opportunities
- Pipeline
- $2.42M
- Due in 14 days
- 2
- Awarded
- 1
- Submitted
Riverside Phase 3 Grading
Due Nov 21 · $1,260,000
- Proposal sent
Oak St Sewer Replacement
Due Dec 04 · $842,000
- Estimating
Hilltop Concrete Package
Due Nov 14 · $318,000
- Awarded
Mill Creek Culvert Repair
Due Oct 28 · $462,000
Demo data. Opportunities by due date, value and stage, with the totals you would quote to a bonding agent.
The field record is the project record.
Crews work from the phone. What they record — hours, quantities, equipment, photos, problems — is the same data the office bills from.
- Daily reports capture conditions, crew hours, installed quantities, equipment on site, materials, photos and the issues that need follow-up.
- Pre-job readiness confirms crews, equipment, locates and documents are in place before mobilization.
- Clock in and out on the phone; review crew hours and correct them before they hit the job cost.
- Material requests are built from a takeoff or from scratch and sent out for pricing.
- Current plan sets and project files are readable on site, with the lookahead schedule showing what is coming next.
Daily report · Tue Nov 11
Oak St Sewer Replacement
Crew hours
- M. Alvarez · Operator9.0 hr
- J. Whitfield · Foreman9.0 hr
- T. Okafor · Laborer8.5 hr
Installed today
186 LF · 8" sewer
240 LF scheduled
Equipment on site
2 units · 6.2 hr
336 excavator, 259D
Traffic control permit expires Thursday
Renewal submitted to the city; flagging crew booked.
Demo data. One report per project per day, with the crew, the production and the open issue.
Documents that come out looking like your company.
Proposals, daily and weekly reports, billing statements, fuel reports and asset registers print from the records you already keep — with your logo, colours and document name.
- Print or save to PDF from the document itself: US Letter sheets, repeating column headings, no split rows.
- Branding is set once — logo, display name, logo size — and applies to every printable document.
- Asset cost reports include photos when you want them, grouped by category with subtotals.
- Takeoff results and fuel reports also export to CSV for anyone who wants the numbers in a spreadsheet.
The three documents below are samples shown with demo data. Every document you print is generated from the records in your own account.
Proposal · P-1042
Oak Street Sewer Replacement
Northline Civil
Prepared Nov 11
- Prepared for
- City of Millbrook
- Project
- Oak St · 240 LF
- Valid through
- 30 days
Scope of work
- Furnish and install 8" PVC sanitary sewer main, 1,240 LF including trench, bedding and backfill.
- Install 6 precast manholes with castings, to the elevations shown on the plans.
- Restore pavement and gravel surfaces to pre-construction condition.
Presented as one total · itemized or by section on request
Accepted by · Owner
Date
Proposal
Scope, exclusions and price presented the way you choose. Internal cost never appears on the copy the customer receives.
Weekly project report
Oak St Sewer · Week 45
Nov 3 – Nov 9
Rev 1
- Production
- 186 LF
- of 240 planned
- Labor
- 214 hr
- of 228 budget
- Cost to date
- $612k
- of $842k contract
- Complete
- 38%
- schedule on track
- 01Executive summary
- 02Scope progress
- 03Performance
- 04Site conditions
- 05Appendix
Assembled from the week's field reports and job cost
Weekly project report
Production, hours, cost to date and site conditions, assembled from the week's field reports and job cost.
Asset cost report
Heavy equipment & vehicles
| Photo | Asset | Purchased | Cost |
|---|---|---|---|
| CAT 336 ExcavatorEX-004 | Mar 2023 | $212,500 | |
| CAT 259D Skid SteerEX-011 | Jul 2024 | $64,900 | |
| Kenworth T880 DumpVH-002 | Jan 2022 | $148,000 | |
| Vermeer RTX TrencherEX-018 | Not recorded | $38,400 | |
| Category subtotal | $463,800 | ||
3 assets missing a purchase cost
Asset cost report
Every unit with its purchase date and price, grouped by category with a subtotal — photos optional.
Sample documents shown with demo data · printable to PDF from the platform
Safety paperwork that stays attached to the job.
Create, review, approve and print the safety records a job generates, and keep the file for the project instead of a truck binder.
- Nine record types: JHA/JSA, toolbox talk, site-specific safety plan, daily pre-task briefing, incident and near-miss report, inspection checklist, excavation and trench inspection, emergency contacts, and spill response.
- Use the built-in form for a record type or a company template with your own fields and checklist rows.
- Draft, in review, approved, archived — and an approved record is never overwritten; a correction creates a new revision and keeps the old one.
- Safety data sheets upload into a searchable library with version history, linked to the materials and projects they cover.
- A company admin can designate safety managers to approve records and manage templates.
Site Metric Pro stores, routes and prints the paperwork. It does not replace a competent person, your site safety plan, or a regulator's requirements.
Safety record
Excavation and Trench Inspection Record
- Project
- Oak St Sewer
- Date
- Nov 11
- Depth
- 6 ft 2 in
- Spoil pile set back at least 2 ft from the edgePass
- Ladder within 25 ft of every workerPass
- Utilities located and marked before diggingIssue
- Trench box or sloping to the required anglePass
- Traffic control and signage in placeN/A
Corrective action
811 ticket re-marked by hand before excavation continues.
Demo data. A built-in checklist with one flagged item, a corrective action, and the approval path before it prints.
Know where the machine is, what it burned, and what it costs.
An asset register that also runs the fleet: assignments and transfers, checklists, fuel, scheduled maintenance, and the cost of each unit.
- Categorized register — heavy equipment, attachments, small equipment, tools and instruments, vehicles and trailers — each with photos, purchase date and purchase price.
- Assign or transfer a machine to a project, the yard or an employee; the location is confirmed by the person on site.
- Daily checklists flag a defect and take the unit out of service until an authorized user returns it.
- Fuel is logged from the gauge: gallons are calculated from the tank capacity and the rise between the before and after readings, then priced per gallon.
- Fuel reports total consumption and cost by machine and by job — fuel with no job stays visible as fleet overhead.
- Maintenance schedules run on hours, miles or calendar and show what is due soon, with service history kept per unit.
Fleet · Fuel report
Fuel cost by job
- Gallons
- 1,080 gal
- Fuel cost
- $4,536.00
- Entries
- 38
| Machine | Gallons | Cost | Job |
|---|---|---|---|
| CAT 336 ExcavatorEX-004 | 412 | $1,730.40 | Oak St Sewer |
| CAT 259D Skid SteerEX-011 | 168 | $705.60 | Oak St Sewer |
| Kenworth T880 DumpVH-002 | 286 | $1,201.20 | Riverside Grading |
| Vermeer RTX TrencherEX-018 | 94 | $394.80 | Oak St Sewer |
| Yard / unassigned— | 120 | $504.00 | Fleet overhead |
| Total | 1080 | $4,536.00 |
Demo data. Machine first, then gallons, cost and the job it was burned on, with unassigned fuel called out as overhead.
Cost the job while there is still time to steer it.
Actual labor, materials, equipment and subcontractor cost against the estimate, updated as the field reports come in — not weeks after closeout.
- Estimate versus actual by cost type, with labor hours against the budget and the variance that needs a decision.
- Installed quantities feed progress billing, so the pay application matches what was actually built.
- Approved change orders carry into contract value and the next billing.
- Receipts post to the project they belong to, or to overhead when they are not job cost — never silently mixed.
- The weekly report carries the same numbers you see in job cost, so the PM and the owner read one story.
Job cost
Estimate vs actual
Equipment is $8,400 over — excavator rental ran three weeks past the plan.
Demo data. Equipment over budget while the job is still open — the kind of finding that is only useful before closeout.
The parts that keep a job moving.
Not every capability needs a section of its own. These are the daily pieces the rest of the platform runs on.
Modules included by plan — see pricing for what is available on each tier
Proposals & quotes
Customer-ready documents built from the estimate, with internal costs left internal.
Pre-job readiness
Crews, equipment, locates, and documents confirmed before mobilization.
Plan sets & documents
Current plans, revisions, and project files attached to the job.
Material requests
Build a request from a takeoff or from scratch, then send it out for pricing.
Receipts & price history
Capture material receipts and keep unit pricing current as it changes.
Time tracking
Clock in and out, review crew timesheets, and push hours to the right job.
Change orders
Track scope changes through approval and into the billing.
Inspections
Log inspections, results, and follow-up per project.
Fleet & equipment
Assignments, transfers, maintenance, and operating cost per unit.
Vendors & subcontractors
Vendor records, subcontractor scope, and purchasing in one list.
Weekly reporting
Assemble a PM-ready weekly report from field and cost data.
Project Connect
Share plans and progress with the GCs and subs you invite.
Less Paperwork.More Control.
Bring your estimates, projects, crews, and costs together in one platform built for contractors.
- 30 days free
- No long-term commitment
- Setup help included
