Run Your Projects Smarter.Try It Free for 30 Days.
From estimating and bidding to daily operations and job costing, Site Metric Pro brings your construction business together in one platform. Built for contractors who need less paperwork and more control.
- 30 days free
- No long-term commitment
- Built for contractors
Projects
6
Labor hrs
412
Billed
$86.2K
Oak Ridge Utility Extension
P-1042 · Active
62%Mill Creek Phase 2
P-1038 · Active
38%Route 9 Culvert Replacement
P-1031 · Complete
100%
2 items need attention before mobilization
See Site Metric Pro in action.
See how a takeoff becomes a priced estimate, how that estimate becomes a customer-ready proposal, and how you can track fuel costs by job. All three examples use demo data.
Estimate line items
Draft- Ready-mix concrete, 6" slab$3,425.93
Material · 18.52 CY × $185.00
- Concrete crew — place & finish$1,296.00
Labor · 18.0 HR × $72.00
- Skid steer + screed$168.00
Equipment · 3.5 HR × $48.00
Measure the slab on the plan and the concrete line prices itself from your cost library.
See it on PlatformProposal · P-1042
Oak Street Sewer Replacement
Northline Civil
Prepared Nov 11
- Prepared for
- City of Millbrook
- Project
- Oak St · 240 LF
- Valid through
- 30 days
Scope of work
- Furnish and install 8" PVC sanitary sewer main, 1,240 LF including trench, bedding and backfill.
- Install 6 precast manholes with castings, to the elevations shown on the plans.
- Restore pavement and gravel surfaces to pre-construction condition.
Presented as one total · itemized or by section on request
Accepted by · Owner
Date
Send a proposal built from the estimate — scope, terms and price, with cost left internal.
See it on PlatformFleet · Fuel report
Fuel cost by job
- Gallons
- 1,080 gal
- Fuel cost
- $4,536.00
- Entries
- 38
| Machine | Gallons | Cost | Job |
|---|---|---|---|
| CAT 336 ExcavatorEX-004 | 412 | $1,730.40 | Oak St Sewer |
| CAT 259D Skid SteerEX-011 | 168 | $705.60 | Oak St Sewer |
| Kenworth T880 DumpVH-002 | 286 | $1,201.20 | Riverside Grading |
| Vermeer RTX TrencherEX-018 | 94 | $394.80 | Oak St Sewer |
| Yard / unassigned— | 120 | $504.00 | Fleet overhead |
| Total | 1080 | $4,536.00 |
See what each machine burned and which job paid for it, down to the gallon and the dollar.
See it on PlatformWhere to go next
Pick the question you're trying to answer — the platform, the people it's built for, or how a job runs on it.
Less Paperwork.More Control.
Bring your estimates, projects, crews, and costs together in one platform built for contractors.
- 30 days free
- No long-term commitment
- Setup help included
