Founding Partner Offer — Exclusive Early-Adopter Pricing Ends In:

39D:20H:48M:32S
View Founding Partner Pricing
Construction Operations Software

Run Your Projects Smarter.Try It Free for 30 Days.

From estimating and bidding to daily operations and job costing, Site Metric Pro brings your construction business together in one platform. Built for contractors who need less paperwork and more control.

  • 30 days free
  • No long-term commitment
  • Built for contractors
Home

Projects

6

Labor hrs

412

Billed

$86.2K

Project health% complete
  • Oak Ridge Utility Extension

    P-1042 · Active

    62%
  • Mill Creek Phase 2

    P-1038 · Active

    38%
  • Route 9 Culvert Replacement

    P-1031 · Complete

    100%

2 items need attention before mobilization

In the platform
  • Estimating
  • AI Takeoff
  • Bids
  • Proposals
  • Projects
  • Daily Reports
  • Job Costing
  • Progress Billing
  • Fleet
  • Reporting
What it looks like

See Site Metric Pro in action.

See how a takeoff becomes a priced estimate, how that estimate becomes a customer-ready proposal, and how you can track fuel costs by job. All three examples use demo data.

Takeoff → estimate
Area measured

Estimate line items

Draft
  • Ready-mix concrete, 6" slab$3,425.93

    Material · 18.52 CY × $185.00

  • Concrete crew — place & finish$1,296.00

    Labor · 18.0 HR × $72.00

  • Skid steer + screed$168.00

    Equipment · 3.5 HR × $48.00

18.52 CYcarried as CY, priced from the cost library

Measure the slab on the plan and the concrete line prices itself from your cost library.

See it on Platform
Proposal

Proposal · P-1042

Oak Street Sewer Replacement

Northline Civil

Prepared Nov 11

Prepared for
City of Millbrook
Project
Oak St · 240 LF
Valid through
30 days

Scope of work

  • Furnish and install 8" PVC sanitary sewer main, 1,240 LF including trench, bedding and backfill.
  • Install 6 precast manholes with castings, to the elevations shown on the plans.
  • Restore pavement and gravel surfaces to pre-construction condition.
Base bid$842,000.00

Presented as one total · itemized or by section on request

Accepted by · Owner

Date

Send a proposal built from the estimate — scope, terms and price, with cost left internal.

See it on Platform
Fuel by job

Fleet · Fuel report

Fuel cost by job

PDF CSV
Fuel by machineFuel cost by job
Gallons
1,080 gal
Fuel cost
$4,536.00
Entries
38
MachineGallonsCostJob
CAT 336 ExcavatorEX-004412$1,730.40Oak St Sewer
CAT 259D Skid SteerEX-011168$705.60Oak St Sewer
Kenworth T880 DumpVH-002286$1,201.20Riverside Grading
Vermeer RTX TrencherEX-01894$394.80Oak St Sewer
Yard / unassigned—120$504.00Fleet overhead
Total1080$4,536.00

See what each machine burned and which job paid for it, down to the gallon and the dollar.

See it on Platform
Plan. Manage. Deliver.

Less Paperwork.More Control.

Bring your estimates, projects, crews, and costs together in one platform built for contractors.

  • 30 days free
  • No long-term commitment
  • Setup help included